New Building Update 24th May 2010
Its been a couple of weeks since our last visit to the site, and upon arrival, we didn’t really see that much had changed. However, on closer inspection, the boys have been very busy in our absence. The drains are being put in and are almost complete. The fascia boarding and cladding for the top section of the walls and roof are almost completed ready to take the signage, and the stone and block-work are rising at a fair rate.
Kevin (our on site Mystic Meg) has predicted that the floor will be going in next week, and that there will be a dramatic change over the next two weeks. The building on the whole does look a lot more “finished” and once the glass goes in there will be a massive change in the feel of the building as it will become enclosed and give us a feel for the actual size of the showroom area.
We will be back with another update soon,
Until next time
Latest Articles
-
We’ve done it!!
Sep 16, 2010 -
The new home of Allan Jefferies BMW is now open for one and all to come along and see. We have left our premises of 15 years at Shipley, and moved all... More »
-
Update 20th July 2010
Jul 20, 2010 -
Hello again,
As you will see from the pictures, everything is once again at full speed ahead. The glazing is nearly complete, and gives a real... More »
-
New Building Update 18th June
Jun 18, 2010 -
Concrete, and more concrete!! Literally tonnes of the stuff are being poured into the new showroom floor as we write this. The slab will be laid today,... More »